Confederation Drive/ West Valley Road Intersection Construction Enters Phase 2

City of Corner Brook
PUBLIC ADVISORY

For the information of residents: The Confederation Drive/ West Valley Road intersection will enter a new phase of construction on Monday May 17, 2021.

  • Southbound traffic on Confederation Drive will stop at the temporary stop-controlled intersection before continuing through the construction zone.
  • North-bound traffic on Confederation Drive will be directed to enter the partially-open roundabout before encountering the temporary stop-controlled intersection, where they can continue North-bound on Confederation Drive or turn left to West Valley Road.
  • West Valley Road traffic heading North-bound to Confederation Drive will take a left turn.
  • West Valley Road traffic heading South to the highway exits and Massey Drive will be directed through the partially open roundabout. A temporary stop sign will be in place at the West Valley Road entrance to Confederations Drive.

Entering and exiting the Visitor’s Information Centre, Irving and nearby Car Wash will remain unimpeded. At this time the three way stop will remain at the old intersection of Confederation Drive and West Valley Road. Traffic heading West-bound from Confederation Drive onto West Valley Road will remain unimpeded.

Please follow the direction of flag-people on site at all times and proceed with extreme caution.